green rock contact details for green rock
  • Home
  • About
  • Products
  • Instructions
  • Certificates
  • Projects
  • Contact

Edge Protection for Stair Systems

Temporary protection using unique telescopic rail and debris guard – dress all sizes of stairwell in minutes

Telescopic Temporary Edge Protection of Stairwell on construction sites

The challenge with this type of edge protection is that stair dimensions greatly vary, with the width of returns being vastly different, so no standard size tubes can be manufactured to provide these barriers. Traditionally crews chop-up scaffold to fit stairs, a task that could take up to four days, and have to use heavy overlapping barriers. With the RAPID system the tubes are telescopic so dressing of stairs takes minutes, and all components are very light weight and user friendly.

  • Unique telescopic debris guards offering full edge protection down the flights, landings and half landings, including return
  • Works with concrete, steel and timber stairs
  • Can be installed by clamp, drill or using RAPID’s telescopic post (if stair configuration allows)

Our Products

  • Concrete Structures
  • Steel Structures
  • Timber Frame Structures
  • Stair Systems
  • Trenching/Shoring Systems
  • Lift Shaft / Stair Well Gates
  • Trailer Systems
  • Loading Bay Gates
  • Deck Safe
  • Safety Net Systems

Projects

project galleryView our gallery showing the RAPID EPS system in use on construction sites worldwide... view projects

Certification

certificationThe RAPID EPS system and its components pass safety standards worldwide, including BS EN 13374:2013 for Class A and B Protection, OSHA 1926.502 and ONTARIO Regulation 213/91, AS/NZS 4994.1:2009... read more

Green Rock Ltd, Carriglass, County Longford, Ireland
Phone: 043 33 47738 Email: info@green-rock.ie